Managerial accounting 1b ch17 | 您所在的位置:网站首页 › managerial accounting 1b ch14 accounting homework › Managerial accounting 1b ch17 |
Managerial Accounting 1B
Financial and Managerial Accounting
Chapter 17
Exercise 17-6 Plantwide overhead rate L.O. P1
[The following information applies to the questions displayed below.]
Textra Polymers produces parts for a variety of small machine manufacturers. Most products go through two operations, molding and trimming, before they are ready for packaging. Expected costs and activities for the molding department and for the trimming department for 2011 follow.
Molding Trimming Direct labor hours
52,000 DLH
48,000 DLH
Machine hours
30,500 MH
3,600 MH
Overhead costs
$ 730,000
$ 590,000
Data for two special order parts to be manufactured by the company in 2011 follow:
Part A27C Part X82B Number of units
9,800 units
54,500 units
Machine hours
Molding
5,100 MH
1,020 MH
Trimming
2,600 MH
650 MH
Direct labor hours
Molding 5,500 DLH 2,150 DLH Trimming 700 DLH 3,500 DLH
1.Exercise 17-6 Part 1
Required 1. Compute the plantwide overhead rate using direct labor hours as the base. (Round your answer to 2 decimal places. Omit the "$" sign in your response.)
Plantwide overhead rate
rev: 03-04-11
2.
Exercise 17-6 Part 2
2. Determine the overhead cost assigned to each product line using the plantwide rate computed in part 1.(Round your intermediate calculations to 2 decimal places. Omit the "$" sign in your response.)
Product Overhead cost Part A27C
Part X82B
3.
Exercise 17-7 Departmental overhead rates L.O. P2
Textra Polymers produces parts for a variety of small machine manufacturers. Most products go through two operations, molding and trimming, before they are ready for packaging. Expected costs and activities for the molding department and for the trimming department for 2011 follow.
Molding Trimming Direct labor hours
52,000 DLH
48,000 DLH
Machine hours
30,500 MH
3,600 MH
Overhead costs
$ 730,000
$ 590,000
Data for two special order parts to be manufactured by the company in 2011 follow:
Part A27C Part X82B Number of units
9,800 units
54,500 units
Machine hours
Molding
5,100 MH
1,020 MH
Trimming
2,600 MH
650 MH
Direct labor hours
Molding
5,500 DLH
2,150 DLH
Trimming
700 DLH
3,500 DLH
Required 1. Compute a departmental overhead rate for the molding department based on machine hours and a department overhead rate for the trimming department based on direct labor hours. (Round your answers to 2 decimal places. Omit the "$" sign in your response.)
Department Overhead rate Molding
Trimming
2. Determine the total overhead cost assigned to each product line using the departmental overhead rates from requirement 1. (Round your intermediate calculations to 2 decimal places and final answers to whole dollar amount. Omit the "$" sign in your response.)
Product Molding Trimming Total overhead cost Part A27C
Part X82B
3. Determine the overhead cost per unit for each product line using the departmental rate.. (Round your answers to 2 decimal places. Omit the "$" sign in your response.)
Product Overhead cost Part A27C
Part X82B
4.
Exercise 17-9 Using the plantwide Overhead rate to assess prices L.O. A1, P1
Real Cool produces two different models of air conditioners. The company produces the mechanical systems in their components department. The mechanical systems are combined with the housing assembly in its finishing department. The activities, costs, and drivers associated with these two manufacturing processes and the production support process follow.
Process Activity Overhead Cost Driver Quantity Components Changeover
$ 500,000
Number of batches 800
Machining
279,000
Machine hours 6,000
Setups
225,000
Number of setups 120
$ 1,004,000
Finishing Welding
$ 180,300
Welding hours 3,000
Inspecting
210,000
Number of inspections 700
Rework
75,000
Rework orders 300
$ 465,300
Support Purchasing
$ 135,000
Purchase orders 450
Providing space
32,000
Number of units 5,000
Providing utilities
65,000
Number of units 5,000
$ 232,000
Additional production information concerning its two product lines follows.
Model 145 Model 212 Units produced
1,500
3,500
Welding hours
800
2,200
Batches
400
400
Number of inspections
400
300
Machine hours
1,800
4,200
Setups
60
60
Rework orders
160
140
Purchase orders
300
150
Required 1. Using a plantwide overhead rate based on machine hours, compute the overhead cost per unit for each product line. (Round your intermediate calculations and final answers to 2 decimal places. Omit the "$" sign in your response.)
Product Overhead cost Model 145
Model 212
2. Determine the total cost per unit for each products line if the direct labor and direct materials costs per unit are $250 for Model 145 and $180 for Model 212. (Round your intermediate and final answers to 2 decimal places. Omit the "$" sign in your response.)
Product Total cost Model 145
Model 212
3. Assume if the market price for Model 145 is $800 and the market price for Model 212 is $470, determine the profit or loss per unit for each model. (Input all amounts as positive values. Round your intermediate and final answers to 2 decimal places. Omit the "$" sign in your response.)
Model 145
Model 212
rev: 03-04-11
5.
Exercise 17-13 Using ABC for strategic decisions L.O. P1, P3
Consider the following data for two products of Rowena Manufacturing.
Product A Product B Number of units produced 10,000 units 2,000 units Direct labor cost(@$24 per DLH) 0.20 DLH per unit 0.25 DLH per unit Direct materials cost $ 2 per unit $ 3 per unit
Activity Overhead costs Machine setup
$ 121,000
Materials handling
48,000
Quality control
80,000
$ 249,000
Required 1. Using direct labor hours as the basis for assigning overhead costs, determine the total production cost per unit for each product line. (Round your answers to 2 decimal places. Omit the "$" sign in your response.)
Product A Product B Manufacturing cost per unit
2. Assume if the market price for Product A is $20 and the market price for Product B is $60, determine the profit or loss per unit for each product. (Round your answers to 2 decimal places. Omit the "$" sign in your response. Input all amounts as positive values.)
Product A
Product B
3. Consider the following additional information about these two product lines. If ABC is used for assigning overhead costs to products, what is the cost per unit for Product A and for Product B? (Round your answers to 2 decimal places. Omit the "$" sign in your response.)
Product A Product B Number of setups required for production 10 setups 12 setups Number of parts required 1 part / unit 3 parts / unit Inspection hours required 40 hours 210 hours
Product A Product B Manufacturing cost per unit
4.1 Determine the profit or loss per unit for each product. (Round your answers to 2 decimal places. Input all amounts as positive values. Omit the "$" sign in your response.)
Product A
Product B
Problem 17-1A Evaluating product line costs and prices using ABC L.O. P3
[The following information applies to the questions displayed below.]
Healthy Day Company produces two beverages, PowerPunch and SlimLife. Data about these productsfollow.
PowerPunch SlimLife Production volume 12,500 bottles 180,000 bottles Liquid materials 1,400 gallons 37,000 gallons Dry materials 620 pounds 12,000 pounds Bottles 12,500 bottles 180,000 bottles Labels 3 labels per bottle 1 label per bottle Machine setups 500 setups 300 setups Machine hours 200 MH 3,750 MH
Additional data from its two production departments follow.
Department Driver Cost Mixing department
Liquid materials Gallons
$ 2,304
Dry materials Pounds
6,941
Utilities Machine hours
1,422
Bottling department
Bottles Units
$ 77,000
Labeling Labels per bottle
6,525
Machine setup Setups
20,000
7.
Problem 17-1A Part 2
2. What is the cost per bottle for PowerPunch and SlimLife? (Do not round intermediate calculations and round your final answers to 2 decimal places. Omit the "$" sign in your response.)
PowerPunch SlimLife Average cost per bottle
9.
Problem 17-1A Part 4
4. What is the minimum price that the company should set per bottle of SlimLife?
$0.53 per bottle
$0.86 per bottle
$0.36 per bottle
The price of SlimLife must cover the costs associated with the product, so the minimum price for this product is $0.53 / bottle.
|